Norman Point Office Development

Environmental Impact Statements (EIS)

The project, located at Green Valley Drive and Norman Center Drive, consists of the demolition of two existing office buildings, accommodating construction of two 10-story office buildings, a 14-story office building, and a hotel.

The purpose of the Scoping Decision Document below is to establish the scope of investigation for the Norman Point Office Development - Norman Pointe Environmental Impact Statement (EIS).

Proposed project overview (10KB PDF, 2 pages)

Scoping Decision Document (74KB, 20 pages)

Draft Environmental Impact Statement (218KB, 70 pages)

Final Environmental Impact Statement (53KB, 27 pages)
Original comments and appendices can be viewed on the hard copies at the City Planning Office or the Penn Lake Library.

Adequacy Decision (42KB, 15 pages)
Original comments and appendices can be viewed on the hard copies at the City Planning Office or the Penn Lake Library

EIS Information (18KB, 4 pages)

Informational Memorandum for 12/18/00 Council Meeting (56KB, 19 pages)

Appendices: Memorandum for 12/18/00 Council Meeting (12KB, 3 pages)

Individual pages

The following PDF documents are linked within the Draft EIS, but are provided in case your browser did not download them and to give file size information.

  • Figure 1, Site Location (179KB)
  • Figure 2, USGS Topographic Map (291KB)
  • Figure 3, Aerial Photo (1997) (714KB)
  • Table 1-1, Peak Hour Levels of Service (11KB)
  • Figure 5, Proposed Project Building Cross Section (62KB)
  • Figure 6, Proposed Project Building Cross Section (114KB)
  • Figure 7, Proposed Project Building Cross Section (57KB)
  • Figure 8, Proposed Project Building Cross Section (122KB)
  • Figure 10, Shadow Study, June 21, 10 a.m. (498KB)
  • Figure 11, Shadow Study, June 21, 2 p.m. (520KB)
  • Figure 12, Shadow Study, December 21, 10 a.m. (528KB)
  • Figure 13, Shadow Study, December 21, 2 p.m. (560KB)
  • Figure 14 , Intersection Locations
  • Figure 15, Existing Functional Classification and Directional Distribution of Site Traffic (332KB)
  • Table 4-2, Trip Generation (10KB)
  • Table 4-4, Peak Hour Levels of Service (12KB)
  • Figure 16, Noise Modeling Receptor Location (715KB)
  • Figure 17, Existing Site Conditions (350KB)
  • Appendix A, Traffic Study Tables (44KB)
  • Appendix B, Surface Water Calculations (8KB)

If you have any questions or comments or wish to view maps which were not included in the PDF files due to size reasons, contact the Planning Division at 952-563-8920 or planning@ci.bloomington.mn.us.

 

Quality Services - Affordable Price