In November 2010, the City hired Barr Engineering to complete a feasibility study to examine the existing conditions and causes of temporary flooding within the NE Penn Drainage Area without causing increased flooding at other locations. The study yielded ten alternatives that the City Council evaluated.

The solution chosen by the City Council was Alternative 10, which consists of constructing new, larger storm sewer pipe and inlet capacity in the approximate location shown below. The construction methods proposed will be a combination of open trench and tunneling methods.

Storm sewer alignment map

 

Schedule

The tentative schedule for this project is:

City Council orders design and construction of project December 2011 or January 2012
Hire Consultant to complete the tunneling design February 2012
Bid the project October 2012
Construction begins January 2013

Throughout the project design and construction, updates will be provided via this website, through E-Subscribe, and via direct mailings to those property owners adjacent to the project.

 

 

For more information, contact:

Scott Anderson, Engineering
1700 W. 98th Street
PH: 952-563-4867
E-mail: smanderson@ci.bloomington.mn.us

Resources HOME | Management plans | Map | Ways to protect | Links

 

Quality Services - Affordable Price